亚洲欧洲综合在线,国产精品av高潮,啪啪啪精品区,大鸡巴干BB免费在线

Your Current Location :HomeNewsCompany News  ? Metal detector installation precautions

Service Hotline

+86 13711845437

Manager Zhang

Metal detector installation precautions

Source: Time:2022-08-08 15:35:20 views:

The power supply should be a self-contained system and should be separated from the power supply system of noise-generating equipment and other devices (large motors, packaging machines, etc.). And it should be connected to an outlet closer to the power source.

1. Installation conditions of metal detector


Install this device in a location that meets the following conditions.

? Places where the temperature is not lower than 0°C and not higher than 40°C.

? Places with humidity in the range of 30~85% and no condensation.

? There is no direct sunlight, and there are no heating appliances such as stoves and heaters nearby.

? The fluctuation range of power supply voltage does not exceed ±5%.

? Away from vibration sources, places that are not prone to vibration.

? A place with less dust.

? Places without volatile flammables, corrosive gases and salt water.

? Places where the hot and cold air of the air conditioner does not blow directly against the equipment.



2. Precautions for installation of metal detector


The power supply should be a self-contained system and should be separated from the power supply system of noise-generating equipment and other devices (large motors, packaging machines, etc.). And it should be connected to an outlet closer to the power source.

Please do not wire in multiple directions. If a heavy object is placed on the power cord, it will crush the cord and cause a fire or electric shock.

The power cord should be kept away from heating appliances. Before unplugging the power plug, you should turn off the power switch and pull out by holding the plug.

When this equipment is connected (connected) to other equipment (front and rear conveyors, etc.), malfunction may occur. In this case, please do not connect with other equipment and ground it separately.



3. Adjustment of the plane height of the conveyor belt between the metal detector and the front and rear devices


Adjust the plane height between the equipment and the front and rear conveyor belts to the same level. There should be no gaps between the device's foot bolts and the ground to avoid shaking. After adjustment, the brake nut must be tightened with a wrench.



4. Connection of power supply and grounding of metal detector


To avoid danger, install a circuit breaker in the middle of the power supply to this equipment. Also, if it is used in a humid environment, an earth leakage circuit breaker should be installed.

To avoid electric shock and ensure stable operation of this equipment, the power plug must be grounded. (Use a soft copper wire with a diameter of 1.6mm or a metal wire with equivalent strength that is not easy to corrode. The grounding impedance must be less than 100 ohms.)
Links
国产精品无码制服丝袜| 精品无码一区二区三区AV| 国产在线无码一区二区三区视频| 第一次爱爱| 亚洲精品午夜久久久伊人| 亚洲精品美女久久7777777| 亚洲永久网址在线观看| 免费无挡无摭十八禁视频在线观看 | 欧美潮喷vitacocoxxx| 一本大道道久久九九av综合 | HEZYO东京热无码专区| 成在人线无码aⅴ免费视频| 九热| 精品爽爽爽久久久天天躁狠狠躁| 最近免费中文字幕大全免费版视频 | 国产V片在线播放免费无码| 亚洲人成无码区在线观看| 性色AV无码久久一区二区三区| 桐柏县| 中文国产| brazzers欧美最新极品| 加勒比一区| 人人摸人人操| 久久无码喷吹高潮播放不卡| 国产日韩在线时看| 中文字幕亚洲综合久久2020| 中文无码一区二区三区在线观看| 色久综合网精品一区二区| 天天躁夜夜躁狠狠综合| 久久婷婷五月综合97色一本一本| 免费无码av一区二区三区| 午夜久久久| 国产精品久久久久毛片大屁完整版| 亚洲专区视频| 制服丝袜人妻| 大屁股xxxxⅹ大屁股图片| 伊人久久久久久久久久| 偷拍亚洲色图| 昭觉县| 日产精品久久久久精品三级18| 国产av内射|